Overview

Properties Facilities Group completed a project involving complete internal redecoration of a 5-storey residential building in W1. Many common areas were showing signs of wear and some features needed minor repairs as well. These common areas needed to be revamped.

High grade materials and the best craftsmanship were used in the work. The project was completed methodically, within the promised timeframe and approved budget.

Project Details

Project Client: Private Client


Contract Period: 4 Weeks


Works: • Replastering of all walls in the common areas
• Repainting of all walls and ceilings
• Minor wood panelling and door frame repairs
• Door painting and finishing
• Stripping old paint from all wooden surfaces
• Sanding and repainting of the staircase banisters
• Polishing of the staircase handrails
• Repairs to trim at the base of the walls
• Entire main hallway refurbishment which included minor repairs, replastering and repainting
• Carpet replacement in all common areas including staircases and landings


Internal-Decoration1-PFG Internal-Decoration2-PFG Internal-Decoration3-PFG Internal-Decoration4-PFG Internal-Decoration5-PFG Internal-Decoration6-PFG Internal-Decoration7-PFG Internal-Decoration8-PFG Internal-Decoration9-PFG

An introduction to PFG

Download our Company Brochure. Within our brochure you’ll find helpful information about PFG, case studies, how we can help your business and much more!.

brochure