Overview

PFG are pleased to have carried out some essential works ate Orbital Business Park in London, W18.

Throughout the course of the project, things changed and PFG were able to adapt to suit works required.

Scope of Works

Roof repair
Maintenance team to attend site and carry out the following works:
– Access via Mansafe system Access via 33m MEWP
– Supply of working at height trained operatives
– Supply of roofing supervisor
– Carry out remedial repairs to hole incentre of roof near ridge with Rooflock Tape and Rooflock R resin
– Carryoutfullinspectionofrooftoidentifydefectsand damage-carryout minor repairs where required
– All job-related waste to be removed from site
– Unobstructed access required
– Work to take place within normal working hours
– Full RAMS provided before commencement of works
– Post works report supplied on completion

Actual Works Carried out /Recommendations

Maintenance team attended site and carried out the following works:
– Access via 35m truck mounted access platform with IPAF trained operatives
– Access via Mansafe system on site
– Supply of working at height trained operatives.
– Supply of roofing supervisor
– Investigation carried outfor roof leak
– Operatives investigated a leaking cast iron downpipe. This is badly corroded and had split leaving large holes for water to leak through
– Operatives investigated and made a repair on the leaking metal roof sheet in the centre of the roof utilising the Mansafe system as access
– The area was dried, cleaned and sealed using a bitumen sealant to cover these holes as a temporary repair only
– It was also noted that the gutters are very full with sediment and water
– Works carried out during normal working hour

Project Details

Project Client: Greenford – UB6


Contract Period: 12 Weeks


Works: Roof repair
Maintenance team to attend site and carry out the following works:

– Access via Mansafe system Access via 33m MEWP
– Supply of working at height trained operatives
– Supply of roofing supervisor
– Carry out remedial repairs to hole incentre of roof near ridge with Rooflock Tape and Rooflock R resin
– Carryoutfullinspectionofrooftoidentifydefectsand damage-carryout minor repairs where required
– All job-related waste to be removed from site
– Unobstructed access required
– Work to take place within normal working hours
– Full RAMS provided before commencement of works
– Post works report supplied on completion


« 1 of 5 »

An introduction to PFG

Download our Company Brochure. Within our brochure you’ll find helpful information about PFG, case studies, how we can help your business and much more!.

brochure

Our Clients

Below are a small selection of clients we work with and industries we specialise in. However we work within a wide-range of sectors.